Image 0
STOCK IMAGE

Auction Ended

https://m.media-amazon.com/images/I/71TUf0TxPtL._AC_SL1500_.jpg
https://lotting-media.assets.bidfta.com/lotting_afe395cc-5022-4563-8933-7086b3c03d57
https://lotting-media.assets.bidfta.com/lotting_8a61b5e1-b1e1-4818-bf67-d2877ca98d6f
https://lotting-media.assets.bidfta.com/lotting_d3af071a-b41b-4f69-bbfb-4ae32c19f303
https://m.media-amazon.com/images/I/715mIo+X3CL._AC_SL1500_.jpg

MCS Studio Gallery Classic 20x27 Poster Frame Black Woodgrain, Vertical & Horizontal Wall Hanging Large Picture Frame for Photos, Posters & Art Prints (1-Pack) 20x27 Black Woodgrain, AS IS

Sold
Good Condition
QTY 1
$1.00
MSRP

MSRP is a sample online retail price.

$23.85

Last Update:

03/26/2026, 3:27 PM EST

Item Information

MSRP:

MSRP is a sample online retail price.

$23.85
Condition:
Good Condition
Description:
The MCS Classic Studio Gallery Wall 20 by 27 inch wooden picture frame is the superior choice when framing photographs and artwork. Crafted with a 1.4-inch contoured profile MDF wood frame, the Classic Studio Gallery stylishly showcases your favorite photographs. The classic black woodgrain finish coordinates with most décor styles, making our wood picture frames the perfect addition to your living room, bedroom or entryway. These hanging picture frames have easy-to-use turn buttons and slide in back. This versatile 27x20 frame includes attached sawtooth hangers for vertical or horizontal wall hanging.
Lot Code:
PPE1226327
Additional Info:
Good Condition
Pickup Location:
1301 N Dixieland Road, Rogers AR 72756
Auction Number
RLG2601561

Related Auctions

From ($)To ($)Increment ($)